Custom Control System for Mining Project in Kazakhstan
Kazakhstan
Ubicación
Kazakhstan
Industria
Mining
Material
Copper Ore
Capacidad
250 TPH
Equipo
Jaw + Cone + Screen
Tamaño de Salida
0–25 mm
Entrega
75 Days
Antecedentes del Cliente
Customer operated a large copper mining operation in Kazakhstan and needed an advanced PLC control system with remote monitoring capabilities. Their existing manual control system led to inconsistent production, high labor costs, and difficulty tracking equipment performance across multiple processing lines.
Configuración de Equipos
Primario
Jaw Crusher PE-900×1200
Secundario
Cone Crusher CSB400
Criba
Vibrating Screen 4YK1860
Transportador
8 Sets Belt Conveyor
Proceso de Implementación
Consultation
Equipment Selection
Production
Shipment
Installation
Resultados del Proyecto
| Métrica | Antes | Después |
|---|---|---|
| Capacity | 180 TPH | 250 TPH |
| Downtime | High | Low |
| Output | Inconsistent | Consistent |
Comentarios del Cliente
"The automated control system has revolutionized our operation. We can now monitor and adjust the entire crushing process from a single control room, which has dramatically improved efficiency."
¿Necesita una Solución de Trituración Similar?
Cuéntenos sobre su proyecto y nuestros ingenieros diseñarán una solución para usted.